Bar Chart View¶
A bar chart view draws a labelled array of bars, natively and, in a browser, in Canvas 2D.
| Field | Value |
|---|---|
| ID | REN-52 |
| Status | Planned |
| Scope | Core |
| Pillar | Rendering and 3-D |
| Sprint | 5 |
| Depends On | Scene View (REN-12) |
| Unblocks | None |
| Docs | None |
| Branches | None |
| Design | None |
Coverage Ledger¶
design/roadmap.mdon the branchsprint4, under Scenes and recordings. The scenes part: entities with transforms, points, lines, arrows, boxes, meshes, images and pinhole cameras, with a text log and a bar chart whose drawing moved to sprint 5.design/scenes.mdon the branchsprint4, under Bar Chart. A bar chart live view (kind 8 proposed) of up to 4,096 labelled values, with data views, picks and range selects.design/scenes.mdon the branchsprint4, under text and bars. caliper.text and caliper.bars calls.design/scenes.mdon the branchsprint4, under Decisions. Decisions on the text log, the names caliper.text, caliper.bars and caliper.scene, and separate depth and segmentation calls.design/scenes.mdon the branchsprint4, under Later Scene Work. Drawing of the text log and bar chart natively, in DOM and in Canvas 2D, and applet scenes in recordings and through the hub.design/sprint-4.mdon the branchsprint4, under Moved out. The text log and the bar chart natively (3 days) moved to sprint 5; their messages stay in increment 3's codec.design/sprint-4.mdon the branchsprint4, under Moved out. The text log in DOM and the bar chart in Canvas 2D (3 days) moved to sprint 5.design/sprint-5.mdon the branchsprint4, under 5. Scene additions moved from sprint 4. The text log and the bar chart natively (3 days), moved from sprint 4.design/sprint-5.mdon the branchsprint4, under 5. Scene additions moved from sprint 4. The text log in DOM and the bar chart in Canvas 2D (3 days), moved from sprint 4.design/sprint-5.mdon the branchsprint4, under 5. Scene additions moved from sprint 4. Done when a scene draws each new shape natively and in the browser, a script attached through shared memory receives a pick and a selection without a server, and a text log and a bar chart update natively and in a browser.design/web-geometry.mdon the branchsprint4, under Work Items. The text log in DOM and the bar chart in Canvas 2D; 3 days, moved to sprint 5; the total is 24 builder days with 7 in sprint 5.- Orchestrators' notes,
_notes/HANDOFF-sprint4.md. Trim: text log and bar chart drawing with their Caliper LIB calls moved to sprint 5; their wire codec stays.